Poppies

EBRPD Wildfire Hazard Reduction and Resource Management Plan EIR

In compliance with the California Environmental Quality Act (CEQA), this Draft Environmental Impact Report (EIR) describes the potential environmental consequences that may result from implementation of the East Bay Regional Park District's (EBRPD's) Draft Wildfire Hazard Reduction and Resource Management Plan (Plan). EBRPD is the lead agency for environmental review of the proposed project; this EIR is designed to fully inform EBRPD's decision-makers, other responsible agencies, and the general public of the Plan and the potential consequences of its approval and implementation. The EIR also recommends a set of mitigation measures to reduce or avoid potentially-significant impacts and examines various alternatives to the proposed project.

This Environmental Impact Report (EIR) has been prepared to evaluate the environmental impacts of implementing the East Bay Regional Park District's (EBRPD's) Draft Wildfire Hazard Reduction and Resource Management Plan (Plan). EBRPD developed the Plan to guide ongoing vegetation management activities on EBRPD park lands along the wildland-urban interface to reduce the likelihood of a catastrophic, wind-driven wildfire, such as the 1991 Oakland Hills fire.

EBRPD is the lead agency for environmental review of the proposed project; this EIR is designed to fully inform EBRPD's decision-makers, other responsible agencies, and the general public of the Plan and the potential consequences of its approval and implementation. The EIR also examines various alternatives to the proposed project and recommends a set of mitigation measures to reduce or avoid potentially-significant impacts. A detailed description of the proposed project is provided in Chapter III, Project Description.

All files are downloadable Acrobat PDF documents: 

TABLE OF CONTENTS (PDF)

I.INTRODUCTION (PDF)
A. PURPOSE OF THE EIR
B. PROPOSED PROJECT
C. EIR SCOPE
D. REPORT ORGANIZATION

II.SUMMARY (PDF)
A. PROJECT UNDER REVIEW
B. SUMMARY OF IMPACTS AND MITIGATION MEASURES
C. SUMMARY TABLE

III.PROJECT DESCRIPTION (PDF)
A. INTRODUCTION
B. STUDY AREA LOCATION
C. BACKGROUND AND PLAN PROCESS
D. PROPOSED PROJECT
E. ANTICIPATED ADOPTION AND IMPLEMENTATION
F. INTENDED USES OF THE EIR

IV.SETTING, IMPACTS, AND MITIGATION MEASURES (PDF)
A.LAND USE AND PLANNING POLICY (PDF)
B.BIOLOGICAL RESOURCES (PDF)
C.GEOLOGY, SOILS, AND SEISMICITY (PDF)
D.HYDROLOGY AND WATER QUALITY (PDF)
E.CULTURAL AND PALEONTOLOGICAL RESOURCES (PDF)
F.AIR QUALITY AND GLOBAL CLIMATE CHANGE (PDF)
G.NOISE (PDF)
H.HAZARDS AND HAZARDOUS MATERIALS (PDF)
I.VISUAL RESOURCES (PDF)

V.ALTERNATIVES (PDF)
A. ALTERNATIVES THAT WERE CONSIDERED BUT REJECTED
B. ALTERNATIVES TO THE PLAN
C. ENVIRONMENTALLY-SUPERIOR ALTERNATIVE

VI.CEQA-REQUIRED ASSESSMENT CONCLUSIONS (PDF)
A. GROWTH-INDUCING IMPACTS
B. SIGNIFICANT IRREVERSIBLE CHANGES
C. CUMULATIVE IMPACTS
D. EFFECTS FOUND NOT TO BE SIGNIFICANT
E. SIGNIFICANT UNAVOIDABLE IMPACTS

VII.REPORT PREPARATION (PDF)
A. REPORT PREPARATION
B. PRIMARY EAST BAY REGIONAL PARK DISTRICT CONTACTS
C. REFERENCES
D. COMMUNICATIONS

APPENDICES

Appendix A:Notice of Preparation, Initial Study, Scoping Comments (PDF)
Appendix B:2001 Biological Opinion (PDF)
Appendix C:Cultural Resources Geology and Paleontology (PDF)
Appendix D:Hazards and Hazardous Materials Site Survey Sheets (PDF)

EIR Report Cover (PDF)

Image
wildfire plan cover

Sign up for Monthly e-Newsletter Updates